Warm roof
On flat roofs, a 'warm roof' is one in which the insulation layer is laid on top of roof structure. This results in the structural deck and its supports being at a temperature closer to that of the building’s interior. This is as opposed to a 'cold roof' in which the insulation is below, or within the roof structure, and so the roof structure is closer to the outside temperature.
An 'inverted roof' is a form of warm roof in which the waterproofing layer is beneath the thermal insulation rather than above it.
On pitched roofs, the definition of warm or cold can relate to the entire space below the pitch of the roof, but above the ceiling. This means that a warm roof might be one in which the insulation is installed in line with the rafters (rather than above the roof structure), so that the space under the pitch, ie a loft, attic or other space is insulated and warm. A cold roof in this case would typically have insulation laid above the ceiling so that the loft space below the pitched roof is cold relative to the rest of the property.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.